跳到主要导航 跳到搜索 跳到主要内容

计及源荷不确定性与设备变工况特性的园区综合能源系统协同优化运行方法

  • Peng Li
  • , Jiahao Wang*
  • , Canbing Li
  • , Zixuan Wang
  • , Yunxing Yin
  • , Zhonghe Han
  • , Youpeng Pan
  • , Miao Wen
  • *此作品的通讯作者
  • North China Electric Power University
  • Shanghai Jiao Tong University

科研成果: 期刊稿件文章同行评审

摘要

The community integrated energy system can provide users with reliable, high-quality and economical energy supply by coordinating various energy equipment. However, the uncertainty of source and load and the off-design performance of equipment may easily lead to large energy supply/consumption deviation. To solve this problem, this paper proposes a collaborative optimal scheduling method considering source-load uncertainty and off-design performance. First, a collaborative optimization integrated model of community integrated energy system considering the off-design performance is established, and the uncertainty of source and load is represented by nonlinear interval number. Then, the nonlinear interval number is determinedly converted by using the interval possibility degree, and off-design performance curve is processed by adaptive piecewise linearization. Finally, an actual community integrated energy system is taken as an example for simulation verification. The simulation results show that the proposed method can effectively reduce the adverse effects of source-load uncertainty and off-design performance.

投稿的翻译标题Collaborative Optimal Scheduling of the Community Integrated Energy System Considering Source-load Uncertainty and Equipment Off-design Performance
源语言繁体中文
页(从-至)7802-7811
页数10
期刊Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering
43
20
DOI
出版状态已出版 - 2023
已对外发布

关键词

  • adaptive piecewise linearization
  • collaborative optimal scheduling
  • community integrated energy system
  • nonlinear interval number
  • off-design performance
  • source-load uncertainty

学术指纹

探究 '计及源荷不确定性与设备变工况特性的园区综合能源系统协同优化运行方法' 的科研主题。它们共同构成独一无二的学术指纹。

引用此