摘要
The community integrated energy system can provide users with reliable, high-quality and economical energy supply by coordinating various energy equipment. However, the uncertainty of source and load and the off-design performance of equipment may easily lead to large energy supply/consumption deviation. To solve this problem, this paper proposes a collaborative optimal scheduling method considering source-load uncertainty and off-design performance. First, a collaborative optimization integrated model of community integrated energy system considering the off-design performance is established, and the uncertainty of source and load is represented by nonlinear interval number. Then, the nonlinear interval number is determinedly converted by using the interval possibility degree, and off-design performance curve is processed by adaptive piecewise linearization. Finally, an actual community integrated energy system is taken as an example for simulation verification. The simulation results show that the proposed method can effectively reduce the adverse effects of source-load uncertainty and off-design performance.
| 投稿的翻译标题 | Collaborative Optimal Scheduling of the Community Integrated Energy System Considering Source-load Uncertainty and Equipment Off-design Performance |
|---|---|
| 源语言 | 繁体中文 |
| 页(从-至) | 7802-7811 |
| 页数 | 10 |
| 期刊 | Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering |
| 卷 | 43 |
| 期 | 20 |
| DOI | |
| 出版状态 | 已出版 - 2023 |
| 已对外发布 | 是 |
关键词
- adaptive piecewise linearization
- collaborative optimal scheduling
- community integrated energy system
- nonlinear interval number
- off-design performance
- source-load uncertainty
学术指纹
探究 '计及源荷不确定性与设备变工况特性的园区综合能源系统协同优化运行方法' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver