跳到主要导航 跳到搜索 跳到主要内容

新一代天气雷达 2009—2014 年运行状态分析

  • Mingyi Xu
  • , Feng Li*
  • , Yuancai Xia
  • , Yan Li
  • , Tingting Cao
  • , Shiguang Qin
  • *此作品的通讯作者
  • Nanjing University of Information Science & Technology
  • China Meteorological Administration

科研成果: 期刊稿件文章同行评审

摘要

Atmospheric observing system operations and monitoring (ASOM) is a real-time monitoring system of observation equipment's running status and observation data. In this article, four operating indexes including availability of operation (Ao), mean time between failures (MTBF), failure duration (Tfd ), number of failures (Nf ) are evaluated on the basis of maintenance data of ASOM from 1 December 2009 to 30 November 2014. For the 2014 indexes, Ao and MTBF increase to 99.06% and 1465.08 h respectively while Tfd and Nf reduce to 13.15 h and 4.68 times. In addition, the failure distribution and replacement of radar spare parts in these fault cases and their trends are quantified and evaluated for different radar subsystems and different types of radar. The results, to some extent, make efforts to set up pertinent spare parts supply management, improve maintenance support capability of CINRAD, and, eventually, promote efficiency of China's meteorological observation equipment management.

投稿的翻译标题Analysis of CINRAD Radar Operation Status During 2009–2014
源语言繁体中文
页(从-至)365-372
页数8
期刊Meteorological Monthly
43
3
DOI
出版状态已出版 - 3月 2017
已对外发布

关键词

  • CINRAD
  • operational evaluation
  • radar spare parts

指纹

探究 '新一代天气雷达 2009—2014 年运行状态分析' 的科研主题。它们共同构成独一无二的指纹。

引用此