Skip to main navigation Skip to search Skip to main content

Two-echelon inventory model with service level constraint and controllable lead time sensitive to order quantity

  • Wenya Chou*
  • , Miyuan Shan
  • , Guo Li
  • *Corresponding author for this work
    • Hunan University

    Research output: Contribution to journalArticlepeer-review

    Abstract

    Two-echelon inventory problem with service level constraint and unknown distribution function was analyzed when controllable lead time was sensitive to order quantity. First the basic model of this problem was established and based on relevant analyses the original problem could be changed by Minimax method. Then the optimal order quantity and production quantity influenced by service level constraint were analyzed and range of optimal order quantity and production quantity were given. According to this range, an effective method and tactics were put forward to solve the changed problem. In case analysis, the optimal two-echelon inventory can be obtained and it was analyzed how service level constraint and safety factor influence the optimal two-echelon inventory. The case results show that with the service level constraint and safety factor, the optimal two-echelon inventory is constrained by the higher constraint between service level constraint and safety factor.

    Original languageEnglish
    Pages (from-to)2595-2602
    Number of pages8
    JournalZhongguo Jixie Gongcheng/China Mechanical Engineering
    Volume21
    Issue number21
    Publication statusPublished - 10 Nov 2010

    Keywords

    • Controllable lead time
    • Safety factor
    • Sensitive to order quantity
    • Service level constraint
    • Two-echelon inventory

    Fingerprint

    Dive into the research topics of 'Two-echelon inventory model with service level constraint and controllable lead time sensitive to order quantity'. Together they form a unique fingerprint.

    Cite this