Skip to main navigation Skip to search Skip to main content

Time Period Base Research of Air Traffic Control Equipment Fault Forecast

  • Jinyong Ma*
  • , Jun Qu
  • , Husheng Zhang
  • , Ping Song
  • , Kejie Li
  • , Songhao Bai
  • , Hongliang Lan
  • *Corresponding author for this work
  • Beijing Institute of Technology
  • CAS - Institute of Electronics

Research output: Chapter in Book/Report/Conference proceeding › Conference contribution › peer-review

Abstract

Getting the future result of things is the task of fault forecasting. This paper analyses the mean time between failure (MTBF), the routine maintaining time period, and the calendar time of the equipment (year\quarter\month). The paper uses the theory of maintenance engineering, selects a time as the time period base for the air control equipment.

Original languageEnglish
Title of host publicationProceedings of the International Symposium on Test and Measurement
Pages4007-4009
Number of pages3
Publication statusPublished - 2003

Publication series

NameProceedings of the International Symposium on Test and Measurement
Volume5

Keywords

  • Air Traffic Control Equipment
  • Fault Forecast
  • Time Base

Fingerprint

Dive into the research topics of 'Time Period Base Research of Air Traffic Control Equipment Fault Forecast'. Together they form a unique fingerprint.

Cite this