@inproceedings{bcfa1785e867440facf535a4d777d459,
title = "The gradual optimization automatic mathematic in the job-shop environment",
abstract = "The aim of scheduling is getting a production plan to guide the shop working. Scheduling has become a key part of realizing CIMS along with the modern production development. Thus it can be seen that the position of scheduling in manufacture is extraordinary important. So a practical method must be proposed for the real production environment. The gradual optimize scheduling is proposed to save this problem.",
keywords = "Job-shop scheduling, Manual adjusting, The gradual optimization automatic mathematic",
author = "Li, {Jing Sheng} and Wang, {Ai Min} and Tang, {Cheng Tong}",
year = "2011",
doi = "10.4028/www.scientific.net/AMR.201-203.1317",
language = "English",
isbn = "9783037850398",
series = "Advanced Materials Research",
pages = "1317--1320",
booktitle = "Advanced Manufacturing Systems",
note = "2nd International Conference on Manufacturing Science and Engineering, ICMSE 2011 ; Conference date: 09-04-2011 Through 11-04-2011",
}