Abstract
An acceptance method is proposed for guided missiles' hit probability and initiating explosive devices' reliability. It is helpful for test evaluation because the interests of both producers and accepters are considered. Firstly, the point estimation method for missiles' reliability test evaluation is studied. It is obtained that the number of tested missiles which can be accepted by both producers and users should be increased for improving the reliability. Further more, the sequence checking method and the unilateral lower confidence limit method using binomial distribution are discussed. Finally, an integral nonlinear programming problem is given. It is concluded that these methods are helpful for reliability test evaluation of missile products.
Original language | English |
---|---|
Pages (from-to) | 577-580 |
Number of pages | 4 |
Journal | Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics |
Volume | 30 |
Issue number | 3 |
Publication status | Published - Mar 2008 |
Keywords
- Lower confidence limit
- Point estimation
- Reliability
- Sequence checking