TY - JOUR
T1 - Secondary clearing rules and price determination in direct electricity trading with renewable energy consumption
AU - Zeng, Jiani
AU - Lin, Xiaofan
AU - Zhong, Hua
AU - Liu, Chang
AU - Feng, Donghan
AU - Zhou, Yun
AU - Chen, Chunyi
N1 - Publisher Copyright:
© 2020, State Power Economic Research Institute. All rights reserved.
PY - 2020/10
Y1 - 2020/10
N2 - To promote the accommodation of renewable energy, when renewable energy power generation enterprises participate in the direct purchase of Shanghai power market, all their power needs to be purchased. To satisfy this policy, some provinces use a trading mechanism called secondary clearing, which lacks of relevant research. Therefore, it is necessary to study the transaction process and pricing method of this mechanism. According to the power market model of bilateral bidding and marginal clearing price, this paper establishes a mathematical model of power market which combines matching clearing and secondary clearing, puts forward three principles that pricing of secondary clearing should conform to, and analyses the problems existing in marginal price. A new pricing method is put forward by illustrating with an example.
AB - To promote the accommodation of renewable energy, when renewable energy power generation enterprises participate in the direct purchase of Shanghai power market, all their power needs to be purchased. To satisfy this policy, some provinces use a trading mechanism called secondary clearing, which lacks of relevant research. Therefore, it is necessary to study the transaction process and pricing method of this mechanism. According to the power market model of bilateral bidding and marginal clearing price, this paper establishes a mathematical model of power market which combines matching clearing and secondary clearing, puts forward three principles that pricing of secondary clearing should conform to, and analyses the problems existing in marginal price. A new pricing method is put forward by illustrating with an example.
KW - Direct power purchase
KW - Optimization
KW - Power market
KW - Secondary clearing
UR - http://www.scopus.com/inward/record.url?scp=85096639842&partnerID=8YFLogxK
U2 - 10.12204/j.issn.1000-7229.2020.10.004
DO - 10.12204/j.issn.1000-7229.2020.10.004
M3 - Article
AN - SCOPUS:85096639842
SN - 1000-7229
VL - 41
SP - 30
EP - 37
JO - Dianli Jianshe/Electric Power Construction
JF - Dianli Jianshe/Electric Power Construction
IS - 10
M1 - 1000-7229(2020)10-0030-08
ER -