Abstract
As the main body of power grid operation, county-level power supply enterprises undertake an important emission to guarantee the security of power grid operation and safeguard social power using order. The optimization of grid construction projects has been a key issue of power supply capacity and service level of grid enterprises. According to the actual situation of power grid construction project optimization of county-level power enterprises, on the basis of qualitative analysis of the projects, this paper builds a Bi-level programming model based on quantitative analysis. The upper layer of the model is the target restriction of the optimal portfolio; the lower layer of the model is enterprises' financial restrictions on the size of the enterprise project portfolio. Finally, using a real example to illustrate operation proceeding and the optimization result of the model. Through qualitative analysis and quantitative analysis, the bi-level programming model improves the accuracy and normative standardization of power grid enterprises projects.
| Original language | English |
|---|---|
| Article number | 012186 |
| Journal | IOP Conference Series: Earth and Environmental Science |
| Volume | 81 |
| Issue number | 1 |
| DOIs | |
| Publication status | Published - 5 Aug 2017 |
| Externally published | Yes |
| Event | 2017 2nd International Conference on Materials Science, Energy Technology and Environmental Engineering, MSETEE 2017 - Zhuhai City, China Duration: 28 Apr 2017 → 30 Apr 2017 |
Fingerprint
Dive into the research topics of 'Power Grid Construction Project Portfolio Optimization Based on Bi-level programming model'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver