Permission Dispatching Mechanism Inside and Outside of the Warranty Period for Equipment Maintenance Service System

Yujie Liu, Wenjia Wu, Wen Bo, Chen Han, Quanxin Zhang, Changyou Zhang*

*Corresponding author for this work

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

It is a vital service process for equipment maintenance to ensure regular operation. The equipment transitions from inside of the warranty period to outside of the warranty period and the staff involved in the maintenance service will transform from manufacturer personnel to a mixed team of user teams and third-party companies. The permissions will change with their responsibilities in the equipment maintenance service system. In this paper, we take the maintenance service system of shield tunneling machine equipment as a case, which design the personnel structure of the mixed maintenance team and establish an authorization mechanism to support the multi-team work process of equipment maintenance. We design a user group-based hierarchical control strategy that combines the equipment maintenance service system’s resource structure. At the end of this paper, though the simulation-based on Colored Petri Net CPN Tools, we verify the correctness and effectiveness of the permission dispatching mechanism.

Original languageEnglish
Title of host publicationHuman Centered Computing - 6th International Conference, HCC 2020, Revised Selected Papers
EditorsQiaohong Zu, Yong Tang, Vladimir Mladenović
PublisherSpringer Science and Business Media Deutschland GmbH
Pages84-90
Number of pages7
ISBN (Print)9783030706258
DOIs
Publication statusPublished - 2021
Event6th International Conference on Human Centered Computing, HCC 2020 - Kragujevac, Serbia
Duration: 14 Dec 202015 Dec 2020

Publication series

NameLecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics)
Volume12634 LNCS
ISSN (Print)0302-9743
ISSN (Electronic)1611-3349

Conference

Conference6th International Conference on Human Centered Computing, HCC 2020
Country/TerritorySerbia
CityKragujevac
Period14/12/2015/12/20

Keywords

  • Equipment maintenance
  • Inside and outside of the warranty period
  • Permission dispatching mechanism
  • Service system
  • User group

Fingerprint

Dive into the research topics of 'Permission Dispatching Mechanism Inside and Outside of the Warranty Period for Equipment Maintenance Service System'. Together they form a unique fingerprint.

Cite this