Abstract
Train scheduling and maintenance planning compete for the resources in a railway network. A commonly used way is dealing with maintenance planning first and then train scheduling, or vice versa. In this paper, we propose a joint optimization model for the two problems in a railway network with double-track, where the upstream and downstream trains are independent and a maintenance task on a section cannot be split or disrupted. In order to solve the model, a heuristic algorithm using Lagrangian relaxation is developed. Due to the large number of constraints, we use a dynamic constraint-generation technique in the iterations of the sub-gradient optimization procedure. We apply the model and algorithm to a practical problem in the Chinese railway network, in which some additional trains are inserted into a fixed existing timetable and the maintenance plan on the involved high-speed railway sections is adjusted. The computational results illustrate the effectiveness and efficiency of the proposed model and algorithm.
| Original language | English |
|---|---|
| Pages (from-to) | 64-92 |
| Number of pages | 29 |
| Journal | Transportation Research Part B: Methodological |
| Volume | 134 |
| DOIs | |
| Publication status | Published - Apr 2020 |
Keywords
- Lagrangian relaxation
- Maintenance planning
- Railway network
- Train scheduling
Fingerprint
Dive into the research topics of 'Joint optimization of train scheduling and maintenance planning in a railway network: A heuristic algorithm using Lagrangian relaxation'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver