Abstract
Firstly, based on the analysis of the information that needed to be managed in cable harness virtual assembly planning process, the storage structure based on assembly task and cable harness routing task was put forward, which can record the cable harness virtual assembly planning history. Secondly, post-processing of outcome information was described in three aspects: generation of BOM, producing initialization assembly planning documentation, recording assembly animation. Finally, the above techniques and methods were validated in self-developed virtual assembly prototype software system named VAPP through instances.
| Original language | English |
|---|---|
| Pages (from-to) | 793-797 |
| Number of pages | 5 |
| Journal | Zhongguo Jixie Gongcheng/China Mechanical Engineering |
| Volume | 19 |
| Issue number | 7 |
| Publication status | Published - 10 Apr 2008 |
Keywords
- Cable harness virtual assembly planning
- Cross assembly
- Information management
- Virtual assembly
Fingerprint
Dive into the research topics of 'Information management technology of cable harness virtual assembly planning for cross assembly'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver