Heuristic algorithm for aerospace multi-project scheduling with multi-resource constraints

  • Su Qing*
  • , Yang Haicheng
  • , Jing Shikai
  • , Wang Yanbing
  • *Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

Abstract

To solve the multi-project scheduling problem with multi-resource constraints in aerospace industry, a mathematical model was built and a heuristic algorithm was introduced based on the model. The model is proposed with the target of minimizing the weighted sum of multiproject total duration and single project duration. Considering a single activity requires multiresource and resource can be deprived, the algorithm can optimize the resource allocation among project activities and achieve the goal of the model. The case study shows that the model and algorithm have practical value for engineering application.

Original languageEnglish
Pages (from-to)71-77
Number of pages7
JournalChinese Space Science and Technology
Volume29
Issue number3
Publication statusPublished - Jun 2009
Externally publishedYes

Keywords

  • Heuristic algorithm resource allocation
  • Multi-project scheduling
  • Resource constraints
  • Space engineering management