@inproceedings{ff966b4576ae4835879ff2d9827146a3,
title = "Design of a 3-meter long electromagnetic launcher",
abstract = "A 3-m long, 30-mm square bore launcher has been constructed for electromagnetic launch application at the Institute of Electrical Engineering, Chinese Academy of Sciences (IEECAS).The main purpose of the launcher is to conduct the basic and applied research in electromagnetic launch. An optimum structure of the insulators was adopted through the stress analysis using the software ANSYS. In order to know about the variation of the gap under a certain stress, an air pressure piston (Maximum air pressure 5 MPa) and a position sensitive detector (PSD) were adopted. The measuring results have shown that the rails gap decreases gradually from breech to muzzle; this kind of design can abate the erosion of the rails caused by arc discharge effectively. A total of 85 tests have been performed, including 17 tests of single module discharging and 68 tests of 9 modules sequential discharging, and the highest muzzle velocity of 1.9 km/s with a 45 g mass was achieved operating at a current of 410 kA, 2 ms pulse duration. This launcher is now used for the fundamental research on armature structure, performance of the pulsed power supply and the diagnostic system. A novel launcher based on the previous experimental results is under development.",
keywords = "Armature, Insulators, Rail, Stress analysis",
author = "Yaohong Sun and Ping Yan and Weiqun Yuan and Jun Li and Yingchun Gui and Aimin Lv and Jianxin Nie",
year = "2008",
doi = "10.1109/ELT.2008.27",
language = "English",
isbn = "9781424418336",
series = "2008 14th Symposium on Electromagnetic Launch Technology, EML, Proceedings",
pages = "104--106",
booktitle = "2008 14th Symposium on Electromagnetic Launch Technology, EML, Proceedings",
note = "2008 14th Symposium on Electromagnetic Launch Technology, EML ; Conference date: 10-06-2008 Through 13-06-2008",
}