TY - JOUR
T1 - Compact Real-time Simulator with Spatial-temporal Parallel Design for Large-scale Wind Farms
AU - Fu, Hao
AU - Li, Peng
AU - Fu, Xiaopeng
AU - Yan, Jinyue
AU - Wang, Zhiying
AU - Wang, Kun
AU - Wu, Jianzhong
AU - Wang, Chengshan
N1 - Publisher Copyright:
© 2015 CSEE.
PY - 2023/1/1
Y1 - 2023/1/1
N2 - Real-time simulation of large-scale wind farms with detailed modeling can provide accurate insights into system transient behaviors, but entails challenges in computing resources. This paper develops a compact real-time simulator based on the field programmable gate array (FPGA) for large-scale wind farms, in which the spatial-temporal parallel design method is proposed to address the huge computation resource demand associated with detailed modeling. The wind farm is decoupled into several subsystems based on model consistency, and the electrical system and control system of each subsystem are solved in parallel. Both the module-level pipeline technique and superscalar pipeline technique are introduced to the wind farms' simulation to effectively improve the utilization of hardware resources. In case studies, real-time simulations of two modified wind farms are separately carried out on a single FPGA, including one with 13 permanent magnet synchronous generators under a time-step of 11 μs, and the other with 30 squirrel-cage induction generators under a time-step of 8μ s. Simulation tests, under different scenarios, are implemented to validate the numerical performance of the real-time simulator, and a comparison with the commercial tool PSCAD/EMTDC demonstrates the accuracy and effectiveness of the proposed design.
AB - Real-time simulation of large-scale wind farms with detailed modeling can provide accurate insights into system transient behaviors, but entails challenges in computing resources. This paper develops a compact real-time simulator based on the field programmable gate array (FPGA) for large-scale wind farms, in which the spatial-temporal parallel design method is proposed to address the huge computation resource demand associated with detailed modeling. The wind farm is decoupled into several subsystems based on model consistency, and the electrical system and control system of each subsystem are solved in parallel. Both the module-level pipeline technique and superscalar pipeline technique are introduced to the wind farms' simulation to effectively improve the utilization of hardware resources. In case studies, real-time simulations of two modified wind farms are separately carried out on a single FPGA, including one with 13 permanent magnet synchronous generators under a time-step of 11 μs, and the other with 30 squirrel-cage induction generators under a time-step of 8μ s. Simulation tests, under different scenarios, are implemented to validate the numerical performance of the real-time simulator, and a comparison with the commercial tool PSCAD/EMTDC demonstrates the accuracy and effectiveness of the proposed design.
KW - FPGA
KW - Real-time simulation
KW - hardware design
KW - spatial-temporal parallelism
KW - wind farm
UR - https://www.scopus.com/pages/publications/85148910073
U2 - 10.17775/CSEEJPES.2021.00200
DO - 10.17775/CSEEJPES.2021.00200
M3 - Article
AN - SCOPUS:85148910073
SN - 2096-0042
VL - 9
SP - 50
EP - 65
JO - CSEE Journal of Power and Energy Systems
JF - CSEE Journal of Power and Energy Systems
IS - 1
ER -