Abstract
In high-speed railway operations, a trip sequence plan is made once the timetable is determined, and serves as a reference in the subsequent operations of train units scheduling. In light of the maintenance requirements of train units and periodicity characteristics of trip sequences, we introduce a trip sequence graph to describe the train units’ movement and coupling/splitting in a railway network. Based on the trip sequence graph, two integer linear programming models are then formulated, namely a path-based model and an arc-based model. Integrated with the characteristics of the trip sequence graph, a customized branch-and-price algorithm is developed to solve the path-based model. The two models are applied to the high-speed railway network in eastern China, and through numerical experiments, the effectiveness and applicability of the models are discussed.
| Original language | English |
|---|---|
| Article number | 102150 |
| Journal | Omega (United Kingdom) |
| Volume | 92 |
| DOIs | |
| Publication status | Published - Apr 2020 |
Keywords
- Branch-and-price algorithm
- High-speed railway
- Maintenance
- Train units scheduling
- Trip sequence planning
Fingerprint
Dive into the research topics of 'A branch-and-price approach for trip sequence planning of high-speed train units'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver