Abstract
The reconfigurable assembly stations, the multi-skill workers and the multiTevel assembly Operations show a strong relationship when dealing with the assembly scheduling problem. In view of the lack of scheduling models that consider the above three key capabilities, a reconfigurable assembly shop scheduling model based on the hyper heuristic algorithm was proposed. The correlation of the reconfiguration switching time, regular/key process requirements and personnel/equipment correction factor were quantitative characterization. By using the hyper heuristic algorithm, the multi-scheduling rule would be fitted and the optimal scheduling scheme was iteratively opti-mized with evolutionary operators. The small/large batch instances and the case study of a satellite assembly Workshop were drop in to verify the effectiveness and efficiency of the hyper heuristic algorithm, by reducing the mean/ maximum value of the makespan, the delay time, the assembly time and reconfiguration time in the scheduling.
| Translated title of the contribution | Reconfigurable assembly shop scheduling based on hyper heuristics algorithms |
|---|---|
| Original language | Chinese (Traditional) |
| Pages (from-to) | 399-410 |
| Number of pages | 12 |
| Journal | Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS |
| Volume | 31 |
| Issue number | 2 |
| DOIs | |
| Publication status | Published - 28 Feb 2025 |