Application of link-interface technology in numerical testing of rescue cabin

Yi Xin Zeng*, Chun Hua Bai, Jian Ping Li, Jian Chen, Zhong Qi Wang

*此作品的通讯作者

科研成果: 期刊稿件文章同行评审

摘要

While testing the strength of a rescue cabin under blasting, the door and other special structures of the underground coal mine rescue cabin are usually simplified to shorten the time of calculation. When the rescue cabin is attacked by blasting, the large deformation or failure frequently occurred in those structures. In order to simulate the dynamic response of these special structures without increasing the calculation time, a numerical method based on LS-DYNA named Link-Interface is studied. The cabin door and reinforced ribs are calculated in detail by this method. The results show that as the peak pressure of blast loading is 1.5 MPa, the largest deformation appears at the middle of cabin door, and its maximum displacement diminishes exponentially with pressure rise time. Circumferential ribs play more important role in reducing the surface displacement and increasing the strength of the cabin than axial ribs. The results can provide a certain theoretical basis for designing and testing an underground coal mine rescue cabin.

源语言英语
页(从-至)86-90
页数5
期刊Gaoya Wuli Xuebao/Chinese Journal of High Pressure Physics
28
1
DOI
出版状态已出版 - 2月 2014

指纹

探究 'Application of link-interface technology in numerical testing of rescue cabin' 的科研主题。它们共同构成独一无二的指纹。

引用此