N2 - This paper present s a new reliability assessment method for complex nuclear power equipment based on Goal Oriented (GO) method to evaluate Mean Time To Failures (MTTF). First, the new reliability assessment method is expounded in detail. And its process is formulated. Then, the electronic control system of hoisting mechanism in nuclear power plant is taken as an example to evaluate its MTTF by the new method. The reliability assessment processes are mainly as follows: (i) Conducting system analysis, (ii) Developing GO model, (iii) Selecting test unit by qualitative analysis of GO method, (iv) Collecting test data, (v) Estimating the failure rate of test unit, (vi) Evaluating system MTTF. In order to verify the advantages and rationality of the new reliability assessment method, the results are compared with the results by Monte Carlo method. All in all, this reliability assessment method not only improves the theory of GO method, which is only used to conduct reliability analysis before; but also provides a new approach for reliability assessment of complex nuclear power equipment, so than it can reduces costs, and improve estimating efficiency and accuracy.
AB - This paper present s a new reliability assessment method for complex nuclear power equipment based on Goal Oriented (GO) method to evaluate Mean Time To Failures (MTTF). First, the new reliability assessment method is expounded in detail. And its process is formulated. Then, the electronic control system of hoisting mechanism in nuclear power plant is taken as an example to evaluate its MTTF by the new method. The reliability assessment processes are mainly as follows: (i) Conducting system analysis, (ii) Developing GO model, (iii) Selecting test unit by qualitative analysis of GO method, (iv) Collecting test data, (v) Estimating the failure rate of test unit, (vi) Evaluating system MTTF. In order to verify the advantages and rationality of the new reliability assessment method, the results are compared with the results by Monte Carlo method. All in all, this reliability assessment method not only improves the theory of GO method, which is only used to conduct reliability analysis before; but also provides a new approach for reliability assessment of complex nuclear power equipment, so than it can reduces costs, and improve estimating efficiency and accuracy.
KW - GO method
KW - Nuclear power equipment
KW - Reliability assessment
UR - http://www.scopus.com/inward/record.url?scp=85029676228&partnerID=8YFLogxK
U2 - 10.1115/ICONE25-67546
DO - 10.1115/ICONE25-67546
M3 - Conference contribution
AN - SCOPUS:85029676228
SN - 9784888982566
T3 - International Conference on Nuclear Engineering, Proceedings, ICONE
BT - Operations and Maintenance, Engineering, Modifications, Life Extension, Life Cycle and Balance of Plant; I and C, Digital Controls, and Influence of Human Factors
PB - American Society of Mechanical Engineers (ASME)
T2 - 2017 25th International Conference on Nuclear Engineering, ICONE 2017
Y2 - 2 July 2017 through 6 July 2017
ER -